Asbestos amounts before demolition: 3 federal lines

See the 3 federal asbestos amount lines, who must send written notice, and how California and Minnesota rules stay separate.

Prepared by the · Published · Last checked

Back to Site records

Before demolition, check if the asbestos amount hits the 160-square-foot line for other components, as defined by the federal standard. Legal Information Institute

Key takeaways for check asbestos amount and survey before demolition

  • The federal standard for demolition and renovation applies when the project involves at least 15 square meters (160 square feet) on other facility components, according to Legal Information Institute.
  • Before starting the work, you must provide the Administrator with written notice of intention to demolish or renovate, according to Legal Information Institute. This written notice is a distinct requirement from the physical measurement of the materials.
  • In Minnesota, a survey by a qualified person shall be made to determine if there are asbestos containing materials present in the structure before permitting employees to start any demolition, restoration, or remodeling project, according to Minnesota Office of the Revisor of Statutes. This state-specific survey requirement applies when an employer has, or should have, reason to believe there are asbestos containing materials.
  • Keep the federal amount lines, the EPA notice lines, and the state survey requirements as separate items in your pre-demolition checklist. The 160-square-foot threshold and the written notice are federal standards, while the survey by a qualified person is a specific Minnesota rule. Do not combine these into a single step.

Which amount and which survey the pages name before demolition

The federal standard for demolition and renovation sets specific measurement thresholds that trigger regulatory requirements. According to Legal Information Institute, the standard applies when there is at least 80 linear meters (260 linear feet) on pipes or at least 15 square meters (160 square feet) on other facility components. This same source also defines a cubic threshold for materials where length or area could not be measured previously, specifying at least 1 cubic meter (35 cubic feet) off facility components. These measurements determine whether the material is subject to the standard's requirements before work begins.

The U.S. Environmental Protection Agency provides a parallel perspective on these amounts in its overview of the Asbestos National Emission Standards for Hazardous Air Pollutants (NESHAP). According to U.S. Environmental Protection Agency, if the total amount of asbestos to be removed or disturbed is less than 260 linear feet, 160 square feet, or 35 cubic feet off of facility components, the NESHAP does not require regulated asbestos-containing material to be removed before demolition or renovation activities occur. This statement clarifies the boundary below which the specific removal requirements of the NESHAP do not apply.

The 160 square feet, 260 linear feet, and 35 cubic feet

Federal regulations distinguish between materials that can be measured by length or area and those that cannot. The specific thresholds determine which demolition or renovation activities fall under the standard. You must identify the material type before applying the correct measurement.

Pipes and other facility components For pipes, the threshold is at least 80 linear meters, which equals 260 linear feet, according to Legal Information Institute. For other facility components, the threshold is at least 15 square meters, which equals 160 square feet, according to Legal Information Institute.

Unmeasurable materials When the length or area of facility components could not be measured previously, a different threshold applies. The standard requires at least 1 cubic meter, which equals 35 cubic feet, according to Legal Information Institute. This cubic measurement is the specific alternative for materials where linear or square footage data is unavailable.

Below the threshold Demolition activities involving less than 80 linear meters (260 linear feet) on pipes and less than 15 square meters (160 square feet) on other facility components fall below the specified threshold, according to Legal Information Institute. This distinction is critical for determining whether the specific regulatory requirements for larger quantities apply to your project.

Practical application Measure your pipes in linear feet and your other components in square feet. If you cannot measure the length or area, estimate the volume in cubic feet. Compare your figures to the 260 linear feet, 160 square feet, or 35 cubic feet limits. Record which measurement method you used for each material type. This ensures your documentation matches the specific category defined in the standard.

Illustrative example of the amount lines

Picture one pipe run measured at 80 linear meters, which equals 260 linear feet. Picture other facility components measured at 15 square meters, which equals 160 square feet. Picture material whose length or area could not be measured, estimated at 1 cubic meter, which equals 35 cubic feet. These round figures match the federal lines named above. They are not a real building. Compare each figure with the line for that material type, then write down which method you used.

Notice, the inspection, and the two-year refresher on the EPA page

The regulations require the owner or the operator of the renovation or demolition operation to notify the appropriate delegated entity, often a state agency, before any demolition, or before any renovations of buildings that contain a certain threshold amount of regulated asbestos-containing material, according to U.S. Environmental Protection Agency. The specific rule text states to provide the Administrator with written notice of intention to demolish or renovate, according to Legal Information Institute. You must identify who the delegated entity is for your location before you draft that letter.

The inspection is a separate requirement from the notice. The regulations require a thorough inspection where the demolition or renovation operation will occur, according to U.S. Environmental Protection Agency. Do not assume the notice covers the inspection. The inspection must happen at the site where the work will take place. If you are managing the job site, ensure the inspection report matches the actual area the crew will disturb.

This trained individual needs to receive refresher training every two years, according to U.S. Environmental Protection Agency. The training covers specific topics, including applicability of the rule, notifications, material identification, and control procedures for removal. It also includes adequate wetting, local exhaust ventilation, negative pressure enclosures, and glove-bag procedures. The list continues with High Efficiency Particulate Air (HEPA) filters, waste disposal work practices, reporting and recordkeeping, and asbestos hazards and worker protection, according to U.S. Environmental Protection Agency.

Check your training records against this list. If your last refresher was more than two years ago, schedule the training before the demolition starts. The notice goes to the delegated entity. The inspection happens at the site. The training covers the specific control methods listed above. Keep these three items distinct in your project file. The notice is a communication. The inspection is a physical review. The training is a competency check for the individual. Do not mix them up in your daily log. This keeps the record clear for the next review. For other checks the same day, see Portable ladder checks: 4 steps before climbing, Hot-work handoff: 6 checks before the crew welds, and Noise-assessment logs: 3 checks for your task record.

A filled reference table of the asbestos rules

The following table separates the specific amounts, limits, and notices printed by each publisher. It keeps the federal amount lines, the EPA notice lines, California's fiber limit, and Minnesota's survey as distinct rows. Each row cites only the facts from that specific publisher.

publisher amount or limit it prints notice or survey it names who it applies to
Legal Information Institute 260 linear feet on pipes or 160 square feet on other facility components Not specified in this quote Not specified in this quote
U.S. Environmental Protection Agency Less than 260 linear feet, 160 square feet, or 35 cubic feet the owner or operator notifies the appropriate delegated entity before demolition or renovation Owner or operator of the renovation or demolition operation
California Department of Industrial Relations 0.1 fiber in each cubic centimeter of air as an eight-hour time-weighted average Not specified in this quote the employer ensuring employee exposure
Minnesota Office of the Revisor of Statutes Not specified in this quote a survey by a qualified person before starting demolition, restoration, or remodeling the employer with reason to believe asbestos containing materials are present

The U.S. Environmental Protection Agency states that if the total amount is less than the listed thresholds, the Asbestos NESHAP does not require regulated asbestos-containing material to be removed before activities occur. The Legal Information Institute lists the pipe and component thresholds that trigger the standard. The California Department of Industrial Relations sets an airborne concentration limit for employee exposure. The Minnesota Office of the Revisor of Statutes requires a survey by a qualified person when an employer has reason to believe asbestos is present. Keep these rules separate when checking your site.

California's fiber limit and Minnesota's survey, kept separate

California and Minnesota print different requirements that apply at different points in the demolition process. You must keep the California exposure limit and the Minnesota survey requirement as separate rows in your planning. Do not treat the California fiber number as a substitute for the Minnesota survey, and do not treat the Minnesota survey as a substitute for the California fiber number. Each state rule addresses a specific part of the job: one controls air concentration during work, and the other controls the inspection before work begins.

California Code of Regulations, Title 8, Section 1529, Asbestos, sets an exposure limit for airborne asbestos. The employer shall ensure that no employee is exposed to an airborne concentration of asbestos in excess of 0.1 fiber in each cubic centimeter of air as an eight (8) hour time-weighted average (TWA), as determined by the method prescribed in Appendix A to this section, or by an equivalent method, according to California Department of Industrial Relations. This number is a measurement of air quality during the work. It is not a measurement of the amount of material in the building. It does not tell you whether you need a survey. It tells you what level of airborne fiber is permitted during the eight-hour shift.

The same California page also notes a threshold for specifying a certified supervisor. For operations involving more than 100 square feet of asbestos containing construction material as defined in subsection (r) of this section the competent person may fulfill the requirement contained in Section 341.9 to specify a certified supervisor for asbestos related work, according to California Department of Industrial Relations. It is distinct from the federal 160-square-foot threshold discussed in other sections. Do not mix these numbers. The 0.1 fiber limit is an exposure control. The 100-square-foot note is a management requirement.

Minnesota's rule focuses on the survey before work starts. Before permitting employees to start any demolition, restoration, or remodeling project where an employer has, or should have, reason to believe there are asbestos containing materials, a survey by a qualified person shall be made to determine if there are asbestos containing materials present in the structure, according to Minnesota Office of the Revisor of Statutes. This requirement applies when the employer has, or should have, reason to believe asbestos is present. It is a pre-work inspection. It is not an exposure limit. It does not print a fiber number. It requires a qualified person to look at the structure before employees start.

A blank line for today's demolition check

Fill in the line below today with the building name, the survey status, and the notice status. The federal page notes that if the total amount of asbestos to be removed or disturbed is less than 260 linear feet, 160 square feet, or 35 cubic feet off of facility components, the Asbestos NESHAP does not require regulated asbestos-containing material to be removed before demolition or renovation activities occur, according to U.S. Environmental Protection Agency. Write down the building name and whether you have a survey or notice.

building name: _ survey status: _ notice status: _ _

Example: write the building name, write whether the survey is done, and write whether the notice is sent.

FAQ about asbestos before demolition

Which amounts does the federal page name?

The Legal Information Institute page lists thresholds of at least 80 linear meters (260 linear feet) on pipes or at least 15 square meters (160 square feet) on other facility components according to Legal Information Institute. The U.S. Environmental Protection Agency page adds that if the total amount is less than 260 linear feet, 160 square feet, or 35 cubic feet, the Asbestos NESHAP does not require removal before activities occur according to U.S. Environmental Protection Agency.

What does the EPA page say to notify?

The owner or operator notifies the appropriate delegated entity, often a state agency, before any demolition, or before renovations of buildings that contain a certain threshold amount of regulated asbestos-containing material, according to U.S. Environmental Protection Agency.

What does Minnesota say to survey?

This survey determines if asbestos containing materials are present in the structure. The requirement applies when there is reason to believe such materials exist before work starts.

What is California's fiber number?

The employer shall ensure that no employee is exposed to an airborne concentration of asbestos in excess of 0.1 fiber in each cubic centimeter of air as an eight (8) hour time-weighted average (TWA) according to California Department of Industrial Relations. This limit is determined by the method prescribed in Appendix A to the section or by an equivalent method. It is an exposure limit for employees, distinct from the quantity thresholds for demolition.

What should I write down?

Write the building name, whether a survey was done, and which amount on the page you are comparing. Record the specific threshold from the federal or state page you are using for your check. This documentation helps track compliance steps for each project.