Every guide we have published, newest first.

Start with the newest guide

All guides

Site records

Federal claim deadlines: 6 rules for contractor payment

Separate routine invoices from certified federal claims. List the 6 rules, the $100,000 line and the records to keep for contractor payment.

· 10 min read

Site records

Confined space permit details: 8 checklist items to record

Eight checklist topics for your confined space entry permit and daily site log, with the oxygen threshold, energy isolation and one-year retention rule.

· 10 min read

Site records

Log 10 hydraulic jack checks in the daily record

Ten fields for a hydraulic jack daily log: timing, shock, tagging, parts, lubrication, foundation, slippage, antifreeze, control design, and special approval.

· 12 min read

Site records

Universal waste storage: 6 rules in one table

Check universal waste storage on a construction site with 6 sourced rules for batteries, aerosols and mercury, plus record tips for audits.

· 12 min read

Site records

Serial number warranty tracking: 8 software features

Track installed equipment serial numbers for warranty records: 4 capture steps, a table of 8 documented software behaviors and a simple worksheet.

· 11 min read

Subcontractor coordination

Retainage and withholding: 6 rules for public job subs

Six Minnesota retainage rules for public job subs, from dispute payouts to the warranty ban, plus federal FAR withholding and interest, with citations.

· 12 min read

Site records

Recurring work order rules: 5 settings to configure

Set up 5 recurring work order rules: priority scale, schedule limits, job tags, auto-generation from agreements and segments, with sourced field values.

· 11 min read

Site records

Field service settings: 9 checks before the next shift

Verify nine field service settings for GPS arrival, window style, checklist gates, role access, and file size before the next shift.

· 10 min read

Site records

Duplicate customer record merge: 8 checks

Use eight checks to merge duplicate customer records in HubSpot, ServiceTitan, Housecall Pro, and Power Apps, including permissions, flags, and undo timing.

· 10 min read

Site records

Contract notice deadlines: 5 clocks to check

Five written clocks for a 10-day delay notice, a 20-day change-cost cutoff, mailed notice, a 7-day injury entry, and posting through April 30.

· 11 min read

Site records

Steel joist safety: 9 checks before the lift starts

Check nine steel joist safety rules from three publishers, covering bolts, bridging, landing, construction loads and fall arrest approval.

· 10 min read

Site records

Shovel and hoist safety: 9 points before the shift

Review 9 shovel and hoist safety points, including guards, tower guying and operator access, with Ohio and Washington rules in a reference table.

· 12 min read

Site records

Scaffold and site safety: 9 checks before the shift

Check 9 scaffold and site safety rules covering access, plank deflection, toprail heights, falling objects, platform overhang and tire inflation.

· 11 min read

Site records

MEWP training records: 9 checks before the lift

Nine checks for MEWP operator training and equipment records before a lift, from model familiarisation to imported second-hand inspection rules.

· 11 min read

Site records

Merge duplicate customer records: 6 rules

See six published rules for merging duplicate customer records, from two-at-a-time limits and a 250 merge cap to a 30-minute activity sync.

· 10 min read

Site records

Gas welding log: 9 checks before the shift

Record 9 gas welding checks before the shift, from cylinder valves and torch leaks to hose paths, flashback speed, and combustible floors.

· 14 min read

Site records

Electrical clearance table: 5 rules to verify

Verify five Washington electrical figures before shift work: 30-inch conductor spacing, 18-inch roof clearance, 150 volts to ground, 25 ohms, and 600 volts.

· 10 min read

Site records

Check 6 lead exposure rules before the shift starts

Check 6 lead rules before the shift: quarterly monitoring, medical exemptions, blood-test timing, and compressed-air limits.

· 12 min read

Site records

AFAD and flagger setup: 9 rules to check on site

Check nine AFAD and flagger requirements, including sign sizes, beacon placement, operator training, warning signs and device limitations.

· 13 min read

Site records

MEWP safety checks: 8 rules before daily use

Check 8 MEWP safety rules on ground stability, a 100mm platform gap, wind speed, boom testing, and operator standards before the first lift.

· 11 min read

Site records

Lockout tagout: 9 reference items for site logs

Use 9 lockout tagout reference items from 3 publisher pages to guide suggested site log entries during preparation and before restoring power.

· 12 min read

Site records

Trench protective systems: 9 checks for site records

Review 9 trench protective system checks covering federal slope rules, Washington job-site documents, and inspection before reinforcing steel.

· 12 min read

Site records

Silica safety records: 8 checks for your site file

Use eight silica checklist items to organize exposure notices, respirator records, medical surveillance and dust controls for your site safety file.

· 13 min read

Site records

Scaffold and SDS checks: 8 items for your daily log

Record 8 scaffold and SDS checks in your daily log, covering toeboard coverage, guardrail spacing, flagging and supplier update triggers.

· 12 min read

Site records

Welding in confined spaces: 8 items to verify

Verify 8 checks before welding in a confined space: ventilation, exhaust discharge, rescue removal, respirators, helmets, skin cover, and an attendant.

· 12 min read

Site records

Weekly safety inspection log: 8 checks to record

Use 8 suggested checks to document joint inspections and tailor crew meetings, separating Washington requirements from CCOHS program guidance.

· 12 min read

Site records

Log 8 hard hat compliance items for the daily record

Log 8 hard hat items each day: provision, availability, wear, impact type, electrical class, fit, condition, and visibility under three official rules.

· 12 min read

Site records

Eyewash and shower checks: 8 points before arrival

Eyewash and shower checks: 8 points before arrival. Confirm clearance, flow, activation, temperature, flush time, and access using cited rules.

· 10 min read

Site records

Compressed air cleaning: compare 4 source pages

Compare cleaning pressure, chip guarding, clothing limits and concrete form exceptions across 4 pages, then record your air-hose settings.

· 11 min read

Site records

Welding ventilation checks: 5 items to verify

Verify 5 welding ventilation and protection items before work starts, including system type, fumes, local exhaust, confined space, and eye protection.

· 12 min read

Site records

Respirator fit test log: 5 events that call for a retest

Track five respirator fit test triggers, check facepiece changes and reported fit problems, and review record retention with linked guidance.

· 10 min read

Site records

Harness and lanyard rules: 8 checks before the shift

Check 8 harness and lanyard rules before the shift: impact load, tensile load, inspection, body belts, webbing, and hoist rigging.

· 11 min read

Site records

Check 5 shoring design specs against approved plans

Check five shoring design rows against the approved plans before crew entry, including options 1, 2, and 4 plus shield and data rules.

· 10 min read

Site records

Steel joist cable release rules at 60 feet

See how end attachment, bridging bundles, and tandem placement change for steel joists at 60 feet before hoisting cables are released.

· 12 min read

Site records

Record 8 lockout tagout fields in a site log

Learn how to record 8 lockout tagout fields in a daily site safety log, from lock and tag placement through stored energy, removal, and re-energization.

· 10 min read

Site records

OSHA 300 log: 8 recordable entries to check

Check the 8 OSHA 300 Log entries for a recordable injury, from the business header and case columns through the annual summary certification and posting.

· 11 min read

Site records

How to record an OSHA 300 log injury: 3 forms

Record a work injury or illness on the OSHA 300 Log where it occurred, with days away, restricted work, and three required forms.

· 10 min read

Site records

Temporary heater canvas clearance at 10 feet

Before a temporary heater is lit, record a 10-foot canvas gap, a 2-foot floor pad, and a 4A:40-B:C extinguisher on site.

· 9 min read

Site records

Personnel platform load limit at 50 percent

See how the 50 percent personnel platform limit works, when the trial lift is due, and what California and Washington add before anyone is hoisted.

· 10 min read

Site records

Lead air limits from 4 publisher pages to record

Write the lead action level and exposure limit from the matching publisher page before paint work, using federal, California, Washington, or the GovRegs copy.

· 11 min read

Site records

Earthmoving seat belt check: 4 publisher pages

Check an earthmoving seat belt on 4 publisher pages: the 1969 SAE rule, a 6,000-pound webbing line, and when the belt must not be used.

· 10 min read

Site records

Chlorinated solvents kept 200 feet away in 4 checks

Keep chlorinated solvents 200 feet from the arc, then record the oxygen ban and local exhaust in four checks before welding starts.

· 12 min read

Site records

Trench ladder travel within a 25-foot walk

Pace the lateral walk to the trench ladder before entry. In a trench 4 feet or deeper, keep that walk within 25 feet and write the distance down.

· 9 min read

Site records

Top rail height log: 4 fields before the shift

Write four log fields for the top rail before work, and keep each official page's own height and strength numbers separate.

· 11 min read

Site records

Simple trench slope limit printed as 34 degrees

Compare the 34-degree simple slope printed by California and Washington with the federal 1:1 line and the Ohio words that give no degree.

· 10 min read

Site records

Ring buoy spacing for water work within 200 feet

See how federal, Washington, and California pages set ring buoy spacing at 200 feet, which line length applies, and when a skiff is required.

· 10 min read

Site records

Rebar cover height and size: 3 lines to record

Record three rebar-cover lines: the federal guard sentence, California's 6-foot height, and the 4-inch square or 4 1/2-inch round cover size.

· 10 min read

Site records

Powder tool misfire: hold still for 30 seconds

Hold a misfired powder tool on the work for 30 seconds, then follow the manufacturer's instructions. California prints the steel and masonry edge limits.

· 10 min read

Site records

Portable ladder checks: 4 steps before climbing

Check portable ladder rails, pitch, shift inspections, and power-line clearance before climbing, with state sources and a worked angle example.

· 10 min read

Site records

Oxygen cylinder spacing: 20-foot gap or 5-foot barrier

See how oxygen cylinders stay 20 feet from fuel gas, or behind a 5-foot noncombustible barrier, plus upright storage, valves, and heat response.

· 10 min read

Site records

Overhead line clearance above 50 kV in 6 steps

Six steps to mark boom and crane clearance near an overhead line, including the 10-foot base up to 50 kV and the printed add-on.

· 11 min read

Site records

Noise limits before ear protection on 4 pages

See the noise numbers each of 4 official pages prints, then record which page applies to today's work before ear protection.

· 10 min read

Site records

New worker safety instruction record: 4 checks

Record four safety instruction checks for each new worker: hazards, the safe-practice sheet, injury reporting, and a written orientation note.

· 10 min read

Site records

Loose brick stack height: the 7-foot limit

See the 7-foot loose brick cap, the taper above 4 feet, the block step above 6 feet, and the lumber caps of 20 and 16 feet.

· 9 min read

Site records

Lock out the circuit: 5 checks before repair starts

Five checks to lock, tag, and test a jobsite circuit before repair: tag controls, lock points, one lock per person, verify dead, write steps.

· 13 min read

Site records

Log lifting sling inspections: 6 checks before the lift

Six checks before a materials lift: sling identity, inspection status, damage, temperature exposure, the examination report, and retained evidence.

· 14 min read

Site records

Jobsite toilets and drinking water: 5 pages

Compare five official pages on jobsite toilets and drinking water, then write today's headcount and container checks on a blank sheet.

· 11 min read

Site records

Jobsite light level log: 10 foot-candles, 300 lux

Record the 10 foot-candle tunnel heading figure or the 300 lux control room figure from the applicable page before the shift starts.

· 10 min read

Site records

Injury log entry in 7 days and posting to April 30

Enter each recordable case within 7 days of learning it, post the annual summary from February 1 to April 30, and keep the log for 5 years.

· 10 min read

Site records

Hot-work handoff: 6 checks before the crew welds

Record six hot-work handoff checks before welding: hazards, protection, extinguishers, the opposite side, cylinder storage, and the fire watch.

· 14 min read

Site records

Hoist rope retirement at 6 broken wires in one lay

Retire a running hoist rope at six broken wires in one lay, or three in one strand, using federal, California, and Washington counts.

· 12 min read

Site records

High-visibility gear near traffic: 4 pages

Four official pages name a garment class, the 2004 standard, or a 1,000-foot visibility line for crews near moving traffic.

· 10 min read

Site records

Haul vehicle shift check: 10 parts to verify

Check 10 haul-truck parts at the start of each shift, including the horn, and confirm a reverse alarm that Washington says must be heard 15 feet back.

· 11 min read

Site records

Grinder rest gap in 3 checks before the wheel spins

Set the grinder work rest in 3 checks before use: the one-eighth inch gap, the ring test, and the guard opening limit on the page.

· 9 min read

Site records

Flammable liquid storage: 5 limits to check

Check five flammable-liquid storage limits: approved containers, the 5 gallon can rule, exits, 25 gallons in a room, and cabinet caps.

· 11 min read

Site records

Flagger vest and paddle: 5 checks before traffic

Five checks before traffic moves: flagger need, 1,000-foot visibility, the vest standard, the STOP/SLOW paddle, and where the flagger stands.

· 11 min read

Site records

First-aid checks: 4 rules before the crew starts

Run four first-aid checks before the crew starts: kit access, a certified person, posted numbers, and coverage scope on site.

· 10 min read

Site records

Extinguisher travel rules: 100 feet and 75 feet

See how the federal 100-foot extinguisher travel cap differs from California's 75-foot cap, with 2A area ratings and monthly checks.

· 12 min read

Site records

Excavation notice: 3 fields before the crew digs

Record 3 dig-notice fields before the crew starts: location, who was told, and the date. Federal pages use local times; California prints 2 working days.

· 10 min read

Site records

Debris chute rules from 5 source pages compared

Compare five published chute pages: the federal 20-foot outside-wall drop, the 45-degree enclosure, opening height, guard height, and bumper size.

· 11 min read

Site records

Noise-assessment logs: 3 checks for your task record

Use three sourced checks to log tasks, timing, noise results and instrument evidence, keeping jurisdiction-specific guidance clear for your assessor.

· 10 min read

Site records

Construction laser checks: card and 5 milliwatts

Check the operator card and write the 5-milliwatt exposure line before a construction laser turns on. Post the warning placard for the work area.

· 10 min read

Site records

Confined space entry records: 6 permit checks

Six permit checks for a confined space entry record: roles, atmosphere, authorization, duration, emergency plans, and retention.

· 11 min read

Site records

Silica-control records: 5 fields for concrete work

Record five silica-control fields before concrete work: task, controls, exposure evidence, respiratory protection, and housekeeping or access limits.

· 10 min read

Site records

Concrete grinding controls: 5 checks to record

Record five silica dust control checks for concrete grinding: exposure plan, extraction, respiratory protection, cleanup, and maintenance.

· 11 min read

Site records

Column anchor rods: minimum of 4 before setting

Count 4 anchor rods, confirm the 300-pound design line at 18 inches, and check any written repair notice before a steel column is set.

· 10 min read

Site records

Asbestos amounts before demolition: 3 federal lines

See the 3 federal asbestos amount lines, who must send written notice, and how California and Minnesota rules stay separate.

· 12 min read

Site records

Recordable jobsite injuries: 6 Federal Tests

Check six federal recording criteria, the required OSHA forms, and the seven-calendar-day entry deadline, then document the test each case meets.

· 12 min read

Site records

Construction Daily Log Checklist for Supervisors

A field checklist for daily construction logs: work, crew, weather, deliveries, photos, carry-forward review, and publish steps.

· 14 min read