Blog
Every guide we have published, newest first.
All guides
Federal claim deadlines: 6 rules for contractor payment
Separate routine invoices from certified federal claims. List the 6 rules, the $100,000 line and the records to keep for contractor payment.
Confined space permit details: 8 checklist items to record
Eight checklist topics for your confined space entry permit and daily site log, with the oxygen threshold, energy isolation and one-year retention rule.
Log 10 hydraulic jack checks in the daily record
Ten fields for a hydraulic jack daily log: timing, shock, tagging, parts, lubrication, foundation, slippage, antifreeze, control design, and special approval.
Universal waste storage: 6 rules in one table
Check universal waste storage on a construction site with 6 sourced rules for batteries, aerosols and mercury, plus record tips for audits.
Serial number warranty tracking: 8 software features
Track installed equipment serial numbers for warranty records: 4 capture steps, a table of 8 documented software behaviors and a simple worksheet.
Retainage and withholding: 6 rules for public job subs
Six Minnesota retainage rules for public job subs, from dispute payouts to the warranty ban, plus federal FAR withholding and interest, with citations.
Recurring work order rules: 5 settings to configure
Set up 5 recurring work order rules: priority scale, schedule limits, job tags, auto-generation from agreements and segments, with sourced field values.
Field service settings: 9 checks before the next shift
Verify nine field service settings for GPS arrival, window style, checklist gates, role access, and file size before the next shift.
Duplicate customer record merge: 8 checks
Use eight checks to merge duplicate customer records in HubSpot, ServiceTitan, Housecall Pro, and Power Apps, including permissions, flags, and undo timing.
Contract notice deadlines: 5 clocks to check
Five written clocks for a 10-day delay notice, a 20-day change-cost cutoff, mailed notice, a 7-day injury entry, and posting through April 30.
Steel joist safety: 9 checks before the lift starts
Check nine steel joist safety rules from three publishers, covering bolts, bridging, landing, construction loads and fall arrest approval.
Shovel and hoist safety: 9 points before the shift
Review 9 shovel and hoist safety points, including guards, tower guying and operator access, with Ohio and Washington rules in a reference table.
Scaffold and site safety: 9 checks before the shift
Check 9 scaffold and site safety rules covering access, plank deflection, toprail heights, falling objects, platform overhang and tire inflation.
MEWP training records: 9 checks before the lift
Nine checks for MEWP operator training and equipment records before a lift, from model familiarisation to imported second-hand inspection rules.
Merge duplicate customer records: 6 rules
See six published rules for merging duplicate customer records, from two-at-a-time limits and a 250 merge cap to a 30-minute activity sync.
Gas welding log: 9 checks before the shift
Record 9 gas welding checks before the shift, from cylinder valves and torch leaks to hose paths, flashback speed, and combustible floors.
Electrical clearance table: 5 rules to verify
Verify five Washington electrical figures before shift work: 30-inch conductor spacing, 18-inch roof clearance, 150 volts to ground, 25 ohms, and 600 volts.
Check 6 lead exposure rules before the shift starts
Check 6 lead rules before the shift: quarterly monitoring, medical exemptions, blood-test timing, and compressed-air limits.
AFAD and flagger setup: 9 rules to check on site
Check nine AFAD and flagger requirements, including sign sizes, beacon placement, operator training, warning signs and device limitations.
MEWP safety checks: 8 rules before daily use
Check 8 MEWP safety rules on ground stability, a 100mm platform gap, wind speed, boom testing, and operator standards before the first lift.
Lockout tagout: 9 reference items for site logs
Use 9 lockout tagout reference items from 3 publisher pages to guide suggested site log entries during preparation and before restoring power.
Trench protective systems: 9 checks for site records
Review 9 trench protective system checks covering federal slope rules, Washington job-site documents, and inspection before reinforcing steel.
Silica safety records: 8 checks for your site file
Use eight silica checklist items to organize exposure notices, respirator records, medical surveillance and dust controls for your site safety file.
Scaffold and SDS checks: 8 items for your daily log
Record 8 scaffold and SDS checks in your daily log, covering toeboard coverage, guardrail spacing, flagging and supplier update triggers.
Welding in confined spaces: 8 items to verify
Verify 8 checks before welding in a confined space: ventilation, exhaust discharge, rescue removal, respirators, helmets, skin cover, and an attendant.
Weekly safety inspection log: 8 checks to record
Use 8 suggested checks to document joint inspections and tailor crew meetings, separating Washington requirements from CCOHS program guidance.
Log 8 hard hat compliance items for the daily record
Log 8 hard hat items each day: provision, availability, wear, impact type, electrical class, fit, condition, and visibility under three official rules.
Eyewash and shower checks: 8 points before arrival
Eyewash and shower checks: 8 points before arrival. Confirm clearance, flow, activation, temperature, flush time, and access using cited rules.
Compressed air cleaning: compare 4 source pages
Compare cleaning pressure, chip guarding, clothing limits and concrete form exceptions across 4 pages, then record your air-hose settings.
Welding ventilation checks: 5 items to verify
Verify 5 welding ventilation and protection items before work starts, including system type, fumes, local exhaust, confined space, and eye protection.
Respirator fit test log: 5 events that call for a retest
Track five respirator fit test triggers, check facepiece changes and reported fit problems, and review record retention with linked guidance.
Harness and lanyard rules: 8 checks before the shift
Check 8 harness and lanyard rules before the shift: impact load, tensile load, inspection, body belts, webbing, and hoist rigging.
Check 5 shoring design specs against approved plans
Check five shoring design rows against the approved plans before crew entry, including options 1, 2, and 4 plus shield and data rules.
Steel joist cable release rules at 60 feet
See how end attachment, bridging bundles, and tandem placement change for steel joists at 60 feet before hoisting cables are released.
Record 8 lockout tagout fields in a site log
Learn how to record 8 lockout tagout fields in a daily site safety log, from lock and tag placement through stored energy, removal, and re-energization.
OSHA 300 log: 8 recordable entries to check
Check the 8 OSHA 300 Log entries for a recordable injury, from the business header and case columns through the annual summary certification and posting.
How to record an OSHA 300 log injury: 3 forms
Record a work injury or illness on the OSHA 300 Log where it occurred, with days away, restricted work, and three required forms.
Temporary heater canvas clearance at 10 feet
Before a temporary heater is lit, record a 10-foot canvas gap, a 2-foot floor pad, and a 4A:40-B:C extinguisher on site.
Personnel platform load limit at 50 percent
See how the 50 percent personnel platform limit works, when the trial lift is due, and what California and Washington add before anyone is hoisted.
Lead air limits from 4 publisher pages to record
Write the lead action level and exposure limit from the matching publisher page before paint work, using federal, California, Washington, or the GovRegs copy.
Earthmoving seat belt check: 4 publisher pages
Check an earthmoving seat belt on 4 publisher pages: the 1969 SAE rule, a 6,000-pound webbing line, and when the belt must not be used.
Chlorinated solvents kept 200 feet away in 4 checks
Keep chlorinated solvents 200 feet from the arc, then record the oxygen ban and local exhaust in four checks before welding starts.
Trench ladder travel within a 25-foot walk
Pace the lateral walk to the trench ladder before entry. In a trench 4 feet or deeper, keep that walk within 25 feet and write the distance down.
Top rail height log: 4 fields before the shift
Write four log fields for the top rail before work, and keep each official page's own height and strength numbers separate.
Simple trench slope limit printed as 34 degrees
Compare the 34-degree simple slope printed by California and Washington with the federal 1:1 line and the Ohio words that give no degree.
Ring buoy spacing for water work within 200 feet
See how federal, Washington, and California pages set ring buoy spacing at 200 feet, which line length applies, and when a skiff is required.
Rebar cover height and size: 3 lines to record
Record three rebar-cover lines: the federal guard sentence, California's 6-foot height, and the 4-inch square or 4 1/2-inch round cover size.
Powder tool misfire: hold still for 30 seconds
Hold a misfired powder tool on the work for 30 seconds, then follow the manufacturer's instructions. California prints the steel and masonry edge limits.
Portable ladder checks: 4 steps before climbing
Check portable ladder rails, pitch, shift inspections, and power-line clearance before climbing, with state sources and a worked angle example.
Oxygen cylinder spacing: 20-foot gap or 5-foot barrier
See how oxygen cylinders stay 20 feet from fuel gas, or behind a 5-foot noncombustible barrier, plus upright storage, valves, and heat response.
Overhead line clearance above 50 kV in 6 steps
Six steps to mark boom and crane clearance near an overhead line, including the 10-foot base up to 50 kV and the printed add-on.
Noise limits before ear protection on 4 pages
See the noise numbers each of 4 official pages prints, then record which page applies to today's work before ear protection.
New worker safety instruction record: 4 checks
Record four safety instruction checks for each new worker: hazards, the safe-practice sheet, injury reporting, and a written orientation note.
Loose brick stack height: the 7-foot limit
See the 7-foot loose brick cap, the taper above 4 feet, the block step above 6 feet, and the lumber caps of 20 and 16 feet.
Lock out the circuit: 5 checks before repair starts
Five checks to lock, tag, and test a jobsite circuit before repair: tag controls, lock points, one lock per person, verify dead, write steps.
Log lifting sling inspections: 6 checks before the lift
Six checks before a materials lift: sling identity, inspection status, damage, temperature exposure, the examination report, and retained evidence.
Jobsite toilets and drinking water: 5 pages
Compare five official pages on jobsite toilets and drinking water, then write today's headcount and container checks on a blank sheet.
Jobsite light level log: 10 foot-candles, 300 lux
Record the 10 foot-candle tunnel heading figure or the 300 lux control room figure from the applicable page before the shift starts.
Injury log entry in 7 days and posting to April 30
Enter each recordable case within 7 days of learning it, post the annual summary from February 1 to April 30, and keep the log for 5 years.
Hot-work handoff: 6 checks before the crew welds
Record six hot-work handoff checks before welding: hazards, protection, extinguishers, the opposite side, cylinder storage, and the fire watch.
Hoist rope retirement at 6 broken wires in one lay
Retire a running hoist rope at six broken wires in one lay, or three in one strand, using federal, California, and Washington counts.
High-visibility gear near traffic: 4 pages
Four official pages name a garment class, the 2004 standard, or a 1,000-foot visibility line for crews near moving traffic.
Haul vehicle shift check: 10 parts to verify
Check 10 haul-truck parts at the start of each shift, including the horn, and confirm a reverse alarm that Washington says must be heard 15 feet back.
Grinder rest gap in 3 checks before the wheel spins
Set the grinder work rest in 3 checks before use: the one-eighth inch gap, the ring test, and the guard opening limit on the page.
Flammable liquid storage: 5 limits to check
Check five flammable-liquid storage limits: approved containers, the 5 gallon can rule, exits, 25 gallons in a room, and cabinet caps.
Flagger vest and paddle: 5 checks before traffic
Five checks before traffic moves: flagger need, 1,000-foot visibility, the vest standard, the STOP/SLOW paddle, and where the flagger stands.
First-aid checks: 4 rules before the crew starts
Run four first-aid checks before the crew starts: kit access, a certified person, posted numbers, and coverage scope on site.
Extinguisher travel rules: 100 feet and 75 feet
See how the federal 100-foot extinguisher travel cap differs from California's 75-foot cap, with 2A area ratings and monthly checks.
Excavation notice: 3 fields before the crew digs
Record 3 dig-notice fields before the crew starts: location, who was told, and the date. Federal pages use local times; California prints 2 working days.
Debris chute rules from 5 source pages compared
Compare five published chute pages: the federal 20-foot outside-wall drop, the 45-degree enclosure, opening height, guard height, and bumper size.
Noise-assessment logs: 3 checks for your task record
Use three sourced checks to log tasks, timing, noise results and instrument evidence, keeping jurisdiction-specific guidance clear for your assessor.
Construction laser checks: card and 5 milliwatts
Check the operator card and write the 5-milliwatt exposure line before a construction laser turns on. Post the warning placard for the work area.
Confined space entry records: 6 permit checks
Six permit checks for a confined space entry record: roles, atmosphere, authorization, duration, emergency plans, and retention.
Silica-control records: 5 fields for concrete work
Record five silica-control fields before concrete work: task, controls, exposure evidence, respiratory protection, and housekeeping or access limits.
Concrete grinding controls: 5 checks to record
Record five silica dust control checks for concrete grinding: exposure plan, extraction, respiratory protection, cleanup, and maintenance.
Column anchor rods: minimum of 4 before setting
Count 4 anchor rods, confirm the 300-pound design line at 18 inches, and check any written repair notice before a steel column is set.
Asbestos amounts before demolition: 3 federal lines
See the 3 federal asbestos amount lines, who must send written notice, and how California and Minnesota rules stay separate.
Recordable jobsite injuries: 6 Federal Tests
Check six federal recording criteria, the required OSHA forms, and the seven-calendar-day entry deadline, then document the test each case meets.
Construction Daily Log Checklist for Supervisors
A field checklist for daily construction logs: work, crew, weather, deliveries, photos, carry-forward review, and publish steps.